Historical backtest, not a live simulation. Run the model against a real, documented supply-chain shock and see exactly where the modeled cascade matched public reporting — and where it didn't. Three honest buckets, never a single accuracy percentage.

‹ All replays
TOHOKU-REPLAY
2011-03-11
Renesas Naka fab — 2011 Tohoku earthquake

Renesas Naka fab — 2011 Tohoku earthquake: no documented ground-truth firms from this event are present in the graph at all; 6 documented firms fall outside this graph's scope; the cascade also flagged 2 additional firms not named in this replay's public reporting.

Trigger
The March 11, 2011 Tohoku earthquake and tsunami damaged Renesas Electronics' Naka campus, which produced as much as 40% of the world's automotive microcontroller supply, knocking it offline for roughly three months.
Assumption
Runs this graph's CURRENT supply edges for Renesas against a historical event — not a 2011-accurate edge set (Renesas' listed customers here, e.g. Tesla and Bosch, reflect today's graph, not 2011 relationships). The real-world documented impact was almost entirely downstream automotive OEMs, which this graph deliberately excludes by scope (see the shared design decision in docs/SPEC-PHASE-A.md) — so this replay is a stress test of the graph's COVERAGE, not just its cascade math.
Question
How much of a documented real-world shock is even visible to a semiconductor-only supply graph, and where exactly does that scope boundary sit?
1
Epicenters
2
Tracks hit
0
Documented hits
0
Documented misses
Cascade — modeled blast radius from the real epicenter(s)
Track Goes Dark
Renesas Electronics
2 tracks downstream
Ground-Truth Verdict
Hit · 0In-graph firms the cascade reached, matching documented public reporting.

No in-graph ground-truth firms were reached.

Missed · 0Documented, in-graph firms the cascade did NOT reach — the honest gap, not hidden.

No misses — every in-graph documented firm was reached.

Outside graph coverage · 6Documented firms with no node in this semiconductor-supply-chain graph at all (e.g. downstream automotive OEMs) — out of scope by design, not a model failure.
  • Toyota Motor Corp

    Named a direct Renesas customer; a shortage of 150+ parts left Toyota's North American operations at 30% of capacity for several weeks, and Toyota's own executive vice president called the resulting electronics/microcontroller shortage the company's single biggest obstacle to resuming production.

  • Nissan Motor

    Named a direct Renesas customer in Japan; US dealers went from about 40,000 Nissan units imported in March 2011 to roughly 7,500 expected in May 2011 as the microcontroller shortage cut output.

  • Honda Motor

    Named a direct Renesas customer in Japan; Honda suspended production of three of its top-selling US models and reported quarterly (Jan-Mar 2011) income down 38% to $545 million.

  • General Motors

    Named a direct overseas Renesas customer affected by the microcontroller shortage following the Naka fab damage (roughly 30% of Naka's output went to US/European automakers).

  • Ford Motor

    Named a direct overseas Renesas customer affected by the microcontroller shortage following the Naka fab damage.

  • Chrysler

    Documented among the automakers that curtailed production as a result of the post-earthquake Japanese parts and microcontroller shortage.

Undocumented predictions

The cascade also reached these firms with no matching entry in the documented ground truth above. Public reporting is incomplete — these are predictions, not confirmed documented impacts.

Limitations

This graph is semiconductor-supply-chain-scoped by design and deliberately excludes downstream automotive OEM nodes — every documented 2011 impact firm here falls in the outside-coverage bucket for that reason, not because the cascade got anything wrong. Separately, the cascade runs on TODAY's Renesas supply edges, not a 2011-accurate edge set: any in-graph firm it reaches (e.g. Tesla, Bosch) reflects a present-day relationship, not a documented 2011 impact, and is reported as an undocumented prediction rather than a hit or miss.

Data Provenance· generated 2026-08-10 01:06:49Z
  • Consolidated Screening List (CSL) [LIVE] https://data.trade.gov/downloadable_consolidated_screening_list/v1/consolidated.json @ 2026-08-10T01:06:49.039Z
  • USASpending.gov — DoD award search [LIVE] https://api.usaspending.gov/api/v2/search/spending_by_award/ @ 2026-08-10T01:06:49.377Z
  • Curated ownership aggregation [FALLBACK] @ 2026-08-10T01:06:49.378Z
  • Curated China-ecosystem + Nexperia edges (Phase B, CSET ETO + TechInsights + TrendForce + SCMP + BIS Entity List + Nexperia press release) [FALLBACK] @ 2026-08-10T01:06:49.378Z

Firm/commodity-level signals from public data — not component-level BOM. Scores are an analytic underwriting heuristic, not legal or procurement advice.